Success story

ruhlamat GmbH 
works more efficiently, transparently, and 
on schedule

The hometown of ruhlamat GmbH, nestled in the heart of the Thuringian Forest, may be sleepy, but its production is wide awake. With the APS system FELIOS from Aachen-based optimization specialist INFORM, ruhlamat GmbH has significantly increased its productivity. The planning of this specialist in custom machine engineering is now much more efficient and transparent. Resource availability and on-time delivery have also improved significantly, positively impacting both internal processes and collaboration with customers.

The planning today

"In contrast to the past, when each department planned independently and manually, there is now a company-wide capacity planning system that integrates all productive areas—from development and production to procurement - while highlighting the interdependencies between the different divisions."

Dominik Rüger, Manager Operations Planning & Project Management at ruhlamat GmbH

 
ruhlamat

In special machine construction, flexibility and precision are crucial, as each customer requires individual solutions. The increasing complexity of machines and projects posed significant planning and capacity challenges for ruhlamat without a production planning tool. The lack of real-time data and transparency meant that project delays had to be managed manually. This made it difficult to respond quickly to changes and ensure planning efficiency.

To address these challenges, ruhlamat decided to implement FELIOS | APS as early as 2012. Before its introduction, the company relied heavily on paper-based planning and used the AMS ERP system. Especially when schedules changed, the process was highly time-consuming, as entire paper documents had to be replaced. Additionally, with ERP alone, ruhlamat could only plan based on unlimited capacities. Thanks to FELIOS | APS, capacity constraints can now be realistically determined.

There’s even more potential: With FELIOS | PM 

In 2022, ruhlamat expanded its production planning with FELIOS | PM. This newly developed industry solution enables centralized and comprehensive capacity planning for all productive areas. The ERP system remains the leading system, continuing to manage key data such as master records. However, the entire capacity planning process is now handled within FELIOS | PM, as all employee absences are automatically transferred from the ERP system to the INFORM tool.

With FELIOS | PM, ruhlamat has significantly increased its productivity. Planning is now much more efficient and transparent. Resource availability and on-time delivery have improved considerably, positively impacting both internal processes and collaboration with customers.

Downloads

Register for the PDF download and learn more about how ruhlamat has taken production planning to the next level with FELIOS.

Request the complete ruhlamat Success Story now


Solutions that optimize your business

Learn more about our diverse software solutions tailored to the complex demands of your market.

More success stories

ruhlamat

ruhlamat works more efficiently, transparently, and on schedule thanks to FELIOS.

Since the introduction of FELIOS, ruhlamat has significantly increased its productivity. Planning has become much more efficient and transparent.

Bausch+Ströbel Luftbild

Bausch+Ströbel Relies on FELIOS in Production

Due to the stable, proactive, and more sustainable production planning with FELIOS, Bausch+Ströbel benefits from on-time delivery and higher transparency.

STÖBER Produktbild

STOBER Drive Technology Optimizes Planning Processes with FELIOS

Thanks to the intelligent planning with FELIOS, STOBER increases on-time deliveries and the transparency along the production chain.